Study On Prediction Models For Integrated Scheduling In Semiconductor Manufacturing Lines
- Department of Automation, Tsinghua University
Beijing , China, 100084
guo-l08@mails.tsinghua.edu.cn, {haojinghua, lium}@tsinghua.edu.cn
Abstract
Quality prediction of lot operations is significant for integrated scheduling in semiconductor production line. The modeltraining algorithm needs to be fast and incremental to satisfy the online applications where data comes one by one or chunk by chunk. This paper presents a novel prediction model referred to as Incremental Extreme Least Square Support Vector Machine (IELSSVM), which transforms the data into ELM feature space and then minimizes the structural risk like LSSVM. The transformation into ELM feature space can be regarded as a good dimensionality reduction. The incremental formula is proposed for on-line industrial application to avoid retraining when data comes one by one or chunk by chunk. Detailed comparisons of the IELSSVM algorithm with other incremental algorithms are achieved by simulation on benchmark problems and real overlay prediction problem of lithography in semiconductor production line. The results show that IELSSVM has better performance than other incremental algorithms like OS-ELM.
Key words
quality prediction model; ELM feature space; semiconductor production line; IELSSVM; overlay prediction; integrated scheduling
Digital Object Identifier (DOI)
https://doi.org/10.2298/CSIS120223048G
Publication information
Volume 9, Issue 4 (December 2012)
Special Issue on Recent Advances in Systems and Informatics
Year of Publication: 2012
ISSN: 2406-1018 (Online)
Publisher: ComSIS Consortium
Full text
Available in PDF
Portable Document Format
How to cite
Guo, L., Hao, J., Liu, M.: Study On Prediction Models For Integrated Scheduling In Semiconductor Manufacturing Lines. Computer Science and Information Systems, Vol. 9, No. 4, 1663-1678. (2012), https://doi.org/10.2298/CSIS120223048G